• Construction of a tourist walkway in the city of the future on an area of ​​24,500 square meters.
• Maintenance of the city of the future, Hikestep, with an area of ​​600,000 square meters.
• Replacing and renewing the central workshop and one weapons and ammunition area of ​​28000 square meters.
• Maintenance of Porto New Cairo (Fifth Settlement).
• Maintenance of Porto Cairo assembly (villas).
• Porto Neum October maintenance.
• Establishment of the Porto Ghalib irrigation network.
• Construction and maintenance of (Sunrise) Porto Ghaleb Marsa Alam Hotel, marble lobby and building perimeter, an area of ​​18000 m2.
• Maintenance of (Hilton) Marsa Alam Hotel, an area of ​​85,000 square meters.
• Maintenance of the (Hilton Long Beach) hotel, an area of ​​385,000 square meters.
• Maintenance, renewal and restoration of the marble of Jaz Grand Hotel, Marsa Alam.
• Maintenance of the gardens of the Resta Grand Hotel, Marsa Alam, with an area of ​​90000 m2
• Interlock Hilton Marsa Alam works.
• Renovation of landscaping works in the Old Palace Hotel “Sahl Hasheesh” 45000 m2.
• Marble floors and walls works in the “Old Palace” hotel.
• Consultant of the Resta Grand Hotel, Marsa Alam.

 

  • Construction and renovation of the Ramses railway station in Egypt (Al-Hadayek).
    • Construction of a stadium (Helmy Zamora) in Zamalek Club.
    • Establishing a unique resort in Ain Sokhna (Azha) with an area of ​​265,000 square meters.
    • Establishing a number of “Gardenia” villas.
    • Construction of the railway club stadium.
    • Construction of the stadium of (Qarun Petroleum) Al-Wahat Road.
    • Establishment of main and subsidiary lines networks “Dijla Palms” in the Sixth of October City.
    • Establishing more than 400 chalets in the village of (Sultana Beach) Ras Sidr.
    • Construction and maintenance of (Smart International School) Cairo-Alexandria Desert Road.
    • Maintenance of gardens in the village of (Al-Nasaem) in the Sixth of October City, an area of ​​86000 square meters.
    • Maintenance of gardens in the village of Jasmine Green Land in the Sixth of October City, an area of ​​60,000 square meters
    • Maintenance and renewal of landscape works, a group of museums affiliated to the Ministry of Culture, the Fine Arts Sector.
    • Maintenance of the Russian Cultural Center.
    • Maintenance of the plastic stadium under the supervision of the Enppi Club.
  • Cultivation of the Ministry of Foreign Affairs in the new administrative capital, an area of 28000 square meters.
  • Cultivation of chalets (Golden Beach) North Coast.
  • Cultivation of villas and chalets (Marina) North Coast.
  • Cultivation of a group of chalets in the village of (Venice) Ain Sukhna.
  • Marble and Interlock works at the Ministry of Foreign Affairs in the new administrative capital.
  • Supplying Rattan garden furniture at Sun Rise Marina Porto Ghaleb Hotel.
  • Supplying Rattan garden furniture to the Hilton Marsa Alam Hotel.
  • Supplying all plants at the Hotel (Oasis Reef Bluebay) Sharm El-Sheikh.
  • Maintenance of green spaces at Wesal Residence Compound, an area of 236,000 square meters.
  • Maintenance of green spaces for side islands on Road (9) in front of the City of Arts and Culture, and the median island on Road (3) behind the City of Arts and Culture in the New Administrative Capital, an area of 22,000 square meters.
  • Maintenance of green spaces at the New Administrative Capital Gates, gates (1, 2, 3, 4, 5, 6, 7), an area of 95,000 square meters.
  • Maintenance of green spaces at Bin Zayed Axis in the New Administrative Capital, an area of 5,500 square meters.